Industry
The world needs to build more energy infrastructure in the next decade than it built in the previous century. The permitting process was not designed for this pace.
GET IN TOUCHThe Challenge
It takes longer to permit a wind farm than to build one. Grid connections queue for years. The transition stalls not for lack of capital, but for lack of approvals.
Environmental impact assessments run to thousands of pages. Stakeholder consultations multiply. Regulatory requirements overlap and sometimes contradict. Each project demands a small army of specialists to navigate the approval process.
The result is a curious paradox: urgency without speed. Everyone agrees the infrastructure is needed. No one can agree how to approve it faster.
Our Approach
Ecological surveys, habitat assessments, species impact studies-synthesised and cross-referenced against project parameters. The analysis that takes months, compressed.
Planning frameworks, grid codes, environmental standards-mapped and monitored. Changes flagged before they derail applications already in progress.
Community concerns, landowner negotiations, statutory consultees-tracked systematically. Responses drafted, objections anticipated, consensus built.
Technical studies, capacity assessments, connection applications-the paperwork that stands between generation assets and the grid they need to reach.
Applications
Solar farms, wind projects, battery storage—each facing unique permitting challenges but similar administrative burdens. Scale the development pipeline without scaling the team proportionally.
Transmission and distribution networks racing to accommodate new generation and demand. Connection queues measured in years; AI that helps measure them in months.
Investors deploying capital into energy assets need rapid technical and regulatory due diligence. Faster assessment means faster deployment.
Platform Fit
The energy sector has specific regulatory frameworks, technical requirements, and stakeholder dynamics. Our platforms understand these constraints and work within them.
EXPLORE INFRASTRUCTURE MANAGEMENTNet zero requires infrastructure. Infrastructure requires approvals. We help you get them faster.